09/28/2026
One building. Nearly 40 projects over five years.
Why does Boca Raton Tower keep calling us back? We already know their openings, their building department, and what the inspector will ask for before it asks.
Each unit required custom sizing.
We handled measure, engineering, permitting, installation, and final inspection in-house. Average timeline: 6 to 8 weeks per unit.
No separate engineer to hire. No expediter to chase. One company, one name on the permit.
If your building is facing window or door replacement, we are happy to walk you through what the process actually looks like. đź“‹
CGC1526673 . 4fnx.com